ES | EN

Degree in Biology from the University of Seville, 1992.
Environmental Management Technician by the Confederation of Entrepreneurs of Andalusia (CEA), 1996.
Environmental Education Monitor by the Donana Foundation 21, 1999.

Lines of work in which he specializes:

  • Avifauna studies in various matches.
  • Study and evaluation of Environmental Impact.
  • Environmental and Natural Environment Planning.

He worked for the company Alfonso y Asociados, S.L. for four years until 2001, in the Department of Environmental Control in the marine environment and in parallel, between 1997 and 2000 at the Biological Station of Donana (CSIC) conducting studies on the impact of wind farms on birds and the Society Spanish Ornithology as a field coordinator in monitoring the migration of Leonado Vulture.

He began working in the Department of Nature Conservation in Assistencias Técnicas Clave SL in 2001, since then he has participated in a large number of projects on the study of the Avifauna that is present in environments of solar thermal plants, wind farms or power lines and in environmental impact studies.

The most outstanding projects in which he has participated are:

  • Full-cycle Avifauna study at project sites in 18 parks wind farms in the Guadalteba region. Seville and Malaga Wind Developments, Gamesa Energy, ECYR-Endesa. 2001.
  • Full-cycle Avifauna study, vegetation and natural habitats at the site of the Jimena de la Frontera airport project - Campo de Gibraltar. Naturaleza Costa de Sol, S.A. 2003.
  • Monitoring the presence of Great Bustard (Otis tard) during the period of postproductive migration of males within the Environmental Monitoring Program of the Palomarejo wind farm and its evacuation power line (Écija, Sevilla). First year. Becosa 2006.
  • Study of full-cycle birdlife at the project sites of the Los Santos, Perules, El Paredón and Chimorra wind farms in the province of Córdoba. Enel - Unión Fenosa Renovables, Energías Especiales de Andalucía S.L. 2007.
  • Environmental monitoring of the construction phase of the I / O power lines in the substation) cries (Granada): L / 220 Kv) cries- L / Atarfe-Tajo de La Encantada and L / 220 Kv) cries-L / Caparacena-Tajo De La Encantada. Red Eléctrica de España. 2011.